Energy Storage Installation Professional Exam Prep
Free practice questions

Free ESIP Practice Questions

10 exam-style questions with answers and explanations, straight from our 1,030-question bank. Tap an answer to check yourself. When you're ready, take the scored version in the free practice test.

Start the free practice test → ★★★★★4.9/5 from 2,400+ candidates · No signup

The ESIP exam has 70 questions and runs 4 hours.

These 10 free ESIP questions are organized by exam domain, so you can see how each part of the Energy Storage Installation Professional blueprint is tested. Reveal the answer and explanation under each question.

Domain 1: Development 15% of exam

Question 1

A customer needs critical loads restored after the site has been completely shut down, with neither the utility nor a generator available. The proposed inverter can form an island, and its approved isolation device has passed an outage-transfer test while the inverter was already operating. Battery energy and load-starting capability are adequate. What additional demonstration establishes that the system meets the customer's startup requirement?

Show answer & explanation

Correct answer: C - It starts the required controls and energizes a dead AC bus using battery power.

Question 2

A commercial tariff bills demand using the single highest 15-minute import interval in each calendar month, with no ratchet or time-of-use demand adjustment. An ESS enters service halfway through the month, after an unshaved peak has been recorded. Every remaining interval will be below that peak even without storage, yet the financial model credits additional demand-charge savings for shaving each remaining day's peak. How should the current-month estimate change?

Show answer & explanation

Correct answer: D - Remove the current month's demand savings and assess energy-charge savings separately.

Question 3

For a 90-minute outage, an ESS must supply a constant 6.0 kW critical load. Its current battery capacity is 40.0 kWh DC, and state of charge may fall from 80% to no lower than the customer's 50% reserve. Both percentages refer to that capacity. Discharge-path efficiency is 90%, and the inverter supplies up to 9.0 kW AC continuously. There is no recharging, auxiliary consumption, startup surge, or other limit. What is the largest constant noncritical AC load that may remain connected throughout the outage?

Show answer & explanation

Correct answer: B - 1.20 kW

Domain 2: Design 25% of exam

Question 4

A service panel has a 225 A bus and a 200 A main breaker. One source feeder combines PV and storage output, with a maximum simultaneous continuous output of 54 A. It connects at the opposite end of the bus from the main and qualifies for the 2020 NEC 705.12(B)(3)(2) busbar method. All other conductor, protection, and load checks are satisfied. Does this interconnection require a change to the bus or main breaker?

Show answer & explanation

Correct answer: B - No; the existing bus and main allow up to 56 A of continuous source output.

Question 5

A proposed battery substitution has the same nominal voltage and mating connectors as the original model. The replacement is listed to UL 1973 and has a favorable UL 9540A fire-test report; the existing inverter is listed to UL 1741. However, the complete ESS listing identifies only the original battery model. What evidence would close this gap in the substitution review?

Show answer & explanation

Correct answer: A - An updated ESS listing identifying the exact replacement battery and existing inverter combination.

Question 6

Procurement selects an IP67 ESS enclosure for an outdoor area cleaned with powerful water jets, reasoning that temporary-immersion protection must cover the cleaning exposure. The manufacturer has supplied neither a water-jet qualification nor cleaning permission. Which evidence addresses the proposed exposure?

Show answer & explanation

Correct answer: D - Powerful-water-jet evidence to IP66 and manufacturer permission for the proposed cleaning conditions.

Domain 3: Installation 30% of exam

Question 7

The short-circuit current rating (SCCR) label on an ESS control cabinet states 5 kA, or 22 kA when protected by a specified fuse. The installed fuse meets every condition on that label and has a 100 kA interrupting rating. Available fault current at the cabinet is 10 kA. All ratings apply to the actual circuit voltage and AC/DC system type. Which conclusion is correct for the cabinet's SCCR check?

Show answer & explanation

Correct answer: A - It passes because the specified combination provides a 22 kA cabinet rating.

Question 8

Load-dependent current is detected on the equipment grounding path of a backup subpanel. Its feeder includes L1, L2, neutral, and an equipment grounding conductor (EGC). The approved design retains the service-neutral connection in both grid and backup modes; the backup source is not separately derived, and the subpanel is in the same building. Inspection finds its neutral-to-enclosure strap still installed. All relevant sources are now isolated and absence of voltage verified. What correction addresses the cause?

Show answer & explanation

Correct answer: D - Remove the neutral strap; retain the EGC connection and enclosure equipment bond.

Domain 4: Commissioning 17% of exam

Question 9

Commissioning an LFP battery expansion requires voltage and state of charge (SOC) to be matched before the additional string is connected in parallel. The existing and new strings have the approved model and firmware. Their resting terminal voltages match within the required tolerance, but neither has a validated SOC estimate. The installer records both acceptance criteria as satisfied. How should the commissioning lead assess that entry?

Show answer & explanation

Correct answer: B - Verify SOC separately; LFP's flat voltage region can conceal charge-state differences despite matching voltages.

Domain 5: Operations, Maintenance, and Decommissioning 13% of exam

Question 10

Two identical battery strings feed a common power conversion system through separate fixed branch cables. String A repeatedly supplies less current than string B at matched state of charge, temperature, and voltage. During an approved, isolated diagnostic procedure, the complete strings, including their battery management systems, exchange positions while the branch wiring stays in place. Repeating the operating test shows that the lower current remains at the original branch position. Which fault hypothesis should lead the next investigation?

Show answer & explanation

Correct answer: C - Excess resistance in that position's fixed cables or terminations.

That's 10 of 1,030

The full bank has 1,020 more ESIP questions with explanations.

Continue in the free practice test →

View plans